Building intelligence spends systematic engineering design and systematic part
From;    Author:Stand originally
Building intelligence changes systematic engineering design and system compositive and special aptitude runs temporary measure

General principles

The first, a kind of intelligent building is building development new trend. The basis builds a department (1997) the 60th ministry makes " construction project reconnaissance designs aptitude management to set " reach construction ministry to build (1997) the 60th ministry makes " construction project reconnaissance designs aptitude management to set " reach construction ministry to build (1997) 290 files " build.

The 2nd, systematic engineering design and system are compositive it is to make the building is reached build group of implementation intelligence to change. Be designed to ensure systematic project and the quality with compositive system, level and benefit, must establish normative and orderly market admittance mechanism, national farming establishs systematic engineering design and system letter of compositive and special intelligence consolidates the management that brings into countrywide reconnaissance to design certificate.

The 3rd, every is engaged in the unit with systematic engineering design and compositive system, must obtain postscript of special aptitude card by this method, just can develop systematic engineering design and system compositive business, can assume at the same time seek advice accordingly with project project and debug wait for technical service.

The 4th, systematic project is designed and the team development with compositive system should suit with market demand bearing, execute gross adjusting control and trends management.
Aptitude applies for and examine and approve

The 5th, systematic engineering design and system are compositive aptitude is special apply for and examine and approve a program of certificate to press construction ministry 60 order " construction project reconnaissance and management of design unit aptitude set " in concerned regulation is carried out.

The 6th, systematic project designs aptitude off grade class, compositive aptitude distributes the system for the system compositive business qualifications and record of service pledges and committee of job of expert of subsystem engineering design is in charge of undertaking to declaring material technical examine.

The 7th, unit of systematic engineering design and system are compositive when the unit applies intelligence, should submit following data:
Quadruplication of aptitude application form;
The approval document that the unit creates;
The resume of legal representative and main technique chief and appoint (appoint to a position) file;
The official statistics of on-the-job personnel, the title of technical backbone proves to reach outstanding achievement;
Register place of capital, work and technical equipment;
Unit constitution and the regulations system of concerned management; Other need to use the proof that should issue or data.